Permanent Installations

What Is Permanent Installation?

Typically, casing conveyed as part of the drilling process these are cemented in place fiber optic systems which contain many elements including DAS/DTS/DSS and PT gauge ported to the inside of casing for real-time monitoring. They are strapped to the casing during RIH with minimal or zero change to normal running procedures. Proven protection is used to to ensure cable integrity in long laterals.

Advanced Monitoring for Unconventional Wells

Popular in unconventional wells for frac monitoring, these systems have also gained strong traction for wellbore-integrity surveillance (including CCSU / H₂ wells), micro-seismic characterisation, and monitoring of storage-cavern wells. WnW supplies industry proven hardware to provide a second to none installation from float shoe to wellhead for unconventional wells through to cavern monitoring wells and beyond into higher demanding environments such a geothermal applications where temperatures preclude electronics.  Long laterals are readily accommodated.

Robust solutions for a robust environment are provided to ensure survivability through frac’ing and stimulation to data flow for unconventional, but also for monitoring and wellbore integrity, data such as:

  • Proppant and stage distribution
  • Plug diagnostics such as slippage and ball seat
  • Behind casing communication/Casing breaches
  • Effectiveness of squeezes
  • Sliding sleeve functionality
  • Cross well communications
  • Microseismic analysis
  • Flow back analysis
  • Strain measurement at individual perforation level
  • Cement curing and quality

The key advantage is the ability to instrument and still retain full-bore access for running interventions, production strings, logging tools, workovers etc.

Permanent DFOS installations provide the potential for continuous monitoring throughout the life of the well from flow analysis to reservoir evaluation from shut-ins to flow-back.  The uses of this technology are constantly evolving.

Drop us a line

We’d love to hear from you. Whether you’re exploring DFOS solutions or need support for your current project, our team is ready to help.

Our Offices

United Arab Emirates
United Kingdom
Regional Offices

Contact Us

info@wellnwaves.com
+44(0)2035766692

Scroll to Top